Takt time is the rhythm at which you must finish one unit to meet demand. Enter your shifts and your daily demand to find it.
Takt time
60 s
One unit must be finished every 60 seconds (1 minutes).
Units per hour
60
Production time per day
7.5 h
Minimum stations
Add work content
How it works
- Enter the length of one shift in hours, the break time taken during it, and how many shifts run per day.
- Type the number of units customers need per day.
- Optionally add the total work content of one unit in seconds to see how many stations or people you need.
- Read the takt time in seconds and the units per hour, and compare them with your real cycle time.
What people use it for
Line balancing
Check whether a 90-second assembly can keep up with a demand of 300 units on one shift.
Capacity planning
See what happens to the takt time when demand rises by a third.
Small workshops
Set a target pace for packing orders per day.
Questions
- What is the formula?
- Takt time = net available production time per day ÷ customer demand per day. Net time is the shift length minus breaks, multiplied by the number of shifts. With 8 hours, 30 minutes of breaks and 450 units on one shift, it is 27 000 s ÷ 450 = 60 seconds.
- How is the minimum number of stations found?
- The total work content of one unit divided by the takt time, rounded up. A product needing 150 seconds of work at a 60-second takt needs at least 3 stations or people. It is a lower bound: unbalanced work usually needs more.
- Is takt time the same as cycle time?