Task Day Packer
Write one task per line as “name ; duration” and set the capacity of one day. The tasks are placed in your order, and a new day starts when the next task no longer fits. You see each day with its load and its fill rate, the number of days needed, and a CSV. A task longer than a day is named.
Days needed
3 days
5 tasks, 12 in total, days of 5 · average fill 80%
| Day | Tasks | Load | Fill |
|---|---|---|---|
| Day 1 | Report (3), Slides (2) | 5 | 100% |
| Day 2 | Client call (4) | 4 | 80% |
| Day 3 | Email backlog (2), Plan next week (1) | 3 | 60% |
How it works
- Write the tasks in the order you want to do them, one per line: name ; duration, in hours, minutes or points.
- Enter the capacity of a day in the same unit.
- Tick “allow skipping ahead” if a later, shorter task may fill the room left in an earlier day.
- Read the days and their fill rates, then copy the summary or the CSV.
What people use it for
Work plan
Spread a list of estimates over days of 6 hours and see how many days the list really takes.
Study or revision
Cut a list of chapters into evening sessions of 90 minutes.
Batches and loads
Group jobs into runs of a machine, a van or an oven with a fixed capacity.
Questions
- How are the days filled?
- By default the order is kept. A task goes into the current day if it fits in what is left of it, otherwise a new day starts and the earlier days are never reopened. With 3, 2 and 4 and a capacity of 5, day 1 holds 3 and 2, and day 2 holds 4.
- What does skipping ahead change?
- With the option on, each task goes into the first day that still has room, even an earlier one, as in a first-fit packing. This usually needs fewer days but the order of the tasks may change. It is not guaranteed to find the smallest possible number of days.
- What if one task is longer than a day?
- The page stops and names the task with its line number and its duration, because it fits no day. Split the task in two or raise the capacity. Durations must be above 0, with at most 2 decimals, and the list is limited to 1,000 tasks.
- What is the fill rate?
- It is the load of a day divided by the capacity, as a percentage with one decimal. The average fill rate is the total of all the tasks divided by the number of days times the capacity. The page does not know about breaks, deadlines or dependencies between tasks.